Gold Member Since 2016
Audited Supplier
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd.

Boiler Parts H Finned Tube Economizer, H Finned Tube Economizer, Economizer with H Finned Tube manufacturer / supplier in China, offering Power Plant Boiler Components H Finned Tube Economizer, Hot End Heating Elements Corrugated Sheet Bakset for Rotary Aph, China Supplier Steam Boiler Parts Air Preheater for Industry and so on.

(/ )

Supplier Homepage Product Economizer Power Plant Boiler Components H Finned Tube Economizer

Power Plant Boiler Components H Finned Tube Economizer

FOB Price: US $1,500-1,540 / Ton
Min. Order: 1 Ton
Min. Order FOB Price
1 Ton US $1,500-1,540/ Ton
Get Latest Price
Production Capacity: 200 Ton/Month
Transport Package: Standard Seaworthy Package
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Customization
  • Customized: Customized
  • Fuel: Coal
  • Type: Boiler Part
  • Application: Industry Boiler Power Plant Boiler
  • Warranty: 1 Year
  • Specification: Customization
  • HS Code: 8402111000
  • Certification: ISO, ASME
  • Surface Treatment: Painted
  • Range of Applications: Power station, Industrial
  • Product Name: Boiler Components H Finned Tube Economizer
  • Color: as Your Requirement
  • Trademark: HTEG
  • Origin: Shandong, China
Product Description
Power Plant Boiler Components H Finned Tube Economizer

Product Description
Power plant boiler components H finned tube economizer is a kind of boiler parts, to have two steel circular symmetry to be welded on fluorescent tubes to form fins positive shape much like letter "H", so called H-fin tube. H finned tubes economizer widely used in utility boilers, industrial boilers, marine power, such as the tail of heat exchanger components.
Power Plant Boiler Components H Finned Tube Economizer
Application of H Finned Tube Economizer 

China famous brand H finned tubes economizers are tube heat exchangers located in the top section of a boiler. They raise the feedwater temperature to slightly below saturation temperature. H finned tube economizers are so named because they can make use of the enthalpy in fluid streams that are hot, but not hot enough to be used in a boiler, thereby recovering more useful enthalpy and improving the boiler's efficiency. Economizers preheat the cold water used to fill water wall panels

Characteristics of H Finned Tube Economizer

 1). Add the heat exchange area and reduce the number of tubes, also increase the fume flow section area to reduce the fume speed and abrasion.

2). H type fin tube can be made to double H type fin tube, high rigidness to fit long tube row.

3). H type fin economizer arranged in line to make the space into many small zones, averaged air flow to reduce the abrasion.

4). With straight channel to gain the best ash-blowing effect.

5). The compact structure to reduce the weight and reduce the manufacturing cost.
Power Plant Boiler Components H Finned Tube Economizer
Company Profile

Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.
Power Plant Boiler Components H Finned Tube Economizer

Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.

Our Clients
Every consumer has the chance to visit our workshop before placing the order. we will provide comfortable environment and completed product information for you to know our product deeply. Welcome your inquiry and sincerely hope we can cooperate with each other!
Power Plant Boiler Components H Finned Tube Economizer
Our Certifications
Power Plant Boiler Components H Finned Tube Economizer
1) Certificate of conformity of quality management system certification

2) Environmental management system certificate

3) Occupational health and safety management system certificate

4) Installation, Alteration, Repair & Maintenance License of Special Equipment People's Republic of China
 

FAQ

Q1: Are you trading company or manufacturer ?

A: We are factory.

Q2:When the product can be delivered?

 A: Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.

Q3:What's the advantage of your company?

A:We have exported our boilers and service to more than 50 countries./ we have specialize team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturing technology.
Contact Us
Power Plant Boiler Components H Finned Tube Economizer

Send your message to this supplier
Avatar
Ms. Cherry Shang
*From:
To: Ms. Cherry Shang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now