Gold Member Since 2016
Audited Supplier
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd.

Boiler Parts, Economizer, Low Temperature Economizer manufacturer / supplier in China, offering Good Quality H Finned Tube Economizer with ISO Standard, Thermal Improving Boiler Accessories Steam Superheater and Reheater, China Manufacturer Radiant Steam Superheater Coils in Boiler and so on.

(/ )

Supplier Homepage Product Economizer Good Quality H Finned Tube Economizer with ISO Standard

Good Quality H Finned Tube Economizer with ISO Standard

FOB Price: US $1,400 / Ton
Min. Order: 1 Ton
Min. Order FOB Price
1 Ton US $1,400/ Ton
Get Latest Price
Production Capacity: 180 Tons/Month
Transport Package: Seaworthy Packing
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Customized
  • Customized: Customized
  • Fuel: Coal
  • Type: Energy Saving
  • Trademark: HTEG
  • Origin: China
  • Certification: ISO, TUV
  • Surface Treatment: Painted
  • Range of Applications: Power station, Industrial
  • Packing& Delivery: Seaworthy Packing
  • Specification: Customized
  • HS Code: 8402119000
Product Description
Product Introduction
The economizer has advanced manufacturing technology, strict production technology, detection means, with high-tech snake-like tube production lines.


Product Introduction:

1. Material composition
It is made up of parallel serpentine tubes (carbon steel, alloy steel, etc.) and   collection boxes and other supporting material composition. Tubes generally have 32, 38 and other types of specifications, according to user's needs separately.

2. the structural arrangement
 The basic type is H type and double H type in line arrangement.

3.Features
 A. beautiful appearance, simple fabrication process
 B. diverse layout
 C. ease of installation, ease of construction
 D. a wide range of working pressure

4.Manufacturing and acceptance criteria

 JB/T1611 "boiler tube manufacturing technology conditions";  
 
JB/T1613 "boiler pressure parts welding conditions."


Warranty
1.One year warranty
2.Spare parts available at ex-factory price
3.Different voltage available
4.100% tested before delivery
5. Assist clients to prepare for the first construction, and also can arrange engineer onsite instruction of installation and commissioning
6. Train the first-line operators;
7. Examine the equipment;
Send your message to this supplier
Avatar
Ms. Cherry Shang
*From:
To: Ms. Cherry Shang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now