China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler

Product Details
Customization: Available
Certification: ISO, TUV
Customized: Customized
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
800
Year of Establishment
2003-04-22
  • China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler
  • China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler
  • China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler
  • China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler
  • China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler
  • China Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler
Find Similar Products

Basic Info.

Model NO.
customized
Name
China Manufacture ASME Standard High Efficiency He
Size
Customized or Design Service
Color
as You Required
Delivery Time
Within 30 Days
Certificate
ISO, TUV, BV, ASME
Material
Seamless Steel Pipe
Transport Package
Seaworthy Package
Specification
customized
Trademark
HTEG
Origin
China
HS Code
8402119000
Production Capacity
200ton/Month

Product Description

China manufacture ASME standard high efficiency header for energy saving boiler

Specification:
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc. In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.Boiler part headers for steam boiler have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
2016 hot sell boiler medium header for steam boiler is acting as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

Application:
The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
 
Other products: Enamel coated sheet
Features:
To solve the problem of corrosion to air preheater at low temperature environment and ash fouling, our company has developed a new kind enamel glaze with anti-abrasion, anti-corrosion, and less fouling features.
 
1.    Introducing Germany equipment and adopting advanced technology
2.    Using imported enamel glaze material 
3.    Adopting technology of electrostatic coating
4.    Products with national patents
     Abrasion resisting , less wear and tear and smooth surface with less foulin
 
 
Our company:

Shandong hengtao group, founded in 1995, is located in gaomi city, shandong province.Hengtao group has 470,000,000 RMB of total registered capital, 1,400,000 square meter of land coverage, about 2000 employees and over 3 billion RMB of total assets.
We are one of the manufacturers of boiler and boiler parts in China.We have a team of engineers who have more than 20 years' experience in designing, manufacturing, engineering, supplying of boiler and its spare parts.We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, h-finned tube economizer, spiral finned tube economizer, membrane water wall, header and other customized boiler parts.

Our workshop&shipment:
The product line control:
1.Strength calculation report with applied materials information;
2.100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3.100%X-ray inspection report (welding seam):To ensure the quality of the entire boiler;
4.Hydraulic test report:Ensure the standard working pressure and safety


Faq
Q1:Which port is closest to your location?
A:Qingdao port is closest to our factory, about 1 hour driving distance to our place.

Q2:How about your delivery time?
A:Generally, it will take 30-45 day after receiving your advance payemnt.The specific delivery time depends on the items and the quantity of your order.

Q3:Do you offer overseas installation service?

 
China Manufacture ASME Standard High Efficiency Header for Energy Saving BoilerChina Manufacture ASME Standard High Efficiency Header for Energy Saving BoilerChina Manufacture ASME Standard High Efficiency Header for Energy Saving BoilerChina Manufacture ASME Standard High Efficiency Header for Energy Saving BoilerChina Manufacture ASME Standard High Efficiency Header for Energy Saving Boiler



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier