Energy saving boiler enameled air preheater with china brand ASME standard
Specification:
Air Preheater Baskets are a compact arrangement of profiled metal sheets placed in the Air Preheater rotor in two or more layers and plays the most important role in the process of heat recovery. The bottom layer, or the cold end layer, is where the air enters and the flue gases are discharged, and is therefore, subjected to severe corrosion due to acid dew point. The Material of Construction and the Profile design of the Heating Elements depends on the operating conditions, quality and type of fuel, etc.
Introduction:
To solve the problem of corrosion to air preheater at low temperature environment and ash fouling, our company has developed a new kind enamel glaze with anti-abrasion, anti-corrosion, and less fouling features.
Introduction:
Advantages:
Introducing Germany equipment and adopting advanced technology
Using imported enamel glaze material
Adopting technology of electrostatic coating
Products with national patents
Abrasion resisting , less wear and tear and smooth surface with less fouling
Other products:
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer.
Our company:
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
Our workshop&shipment:
The product line control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
FAQ
Q1: Which port is closest to your location?
A: Qingdao Port is closest to our factory, about 1 hour driving distance to our place.
Q2: How about your delivery time?
A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.
Q3: Do you offer overseas installation service?