Customization: | Available |
---|---|
Certification: | ISO |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
China supplier steam boiler parts air preheater for industry is the equipment that uses the boiler tail flue smoke to heat the entering air with its inside tubes .It is used to improve the heat exchange performance of the boiler, and reduce energy consumption.
Specification
1.High corrossion resistance proerty;
2.Small covering area;
3.Pipe and tube plate in every link between separated, the heated bilges cold heat distortion is not bound to avoid stress destruction;
4.Single pipe, tube single or parts of equipment failure does not affect the heat normal operation
Features
1. China supplier steam boiler parts air preheaters are not easily broken enamel surface, no crack, acid and alkali resistance, resistance to gas erosion, smooth and high, gas flow resistance, easy Fouling;
2. As the flue gas across tube, the flue gas side of the heat capacity of exile to strengthen, under the same heat transfer coefficient (enamel thickness ratio of thermal conductivity with very small, about 0.0002, the calculation is negligible), wall temperature vertical preheater than ordinary steel increased 10-30 Degree Celsius, the overall heat transfer coefficient of about 20.3-24.2W;
3. Two horizontal enamel sealing tube box, the sealed tube box structure welded high strength, pipe damaged or the overall change can only block, and heat-packing seal, can only replace the damaged pipe tube, easy maintenance;
4. Steam boiler parts air preheater is mainly used for boiler preheater, the low temperature.
Company Profile
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
Our Workshop
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
Package & Delivery
Packing Details: We have standard seaworthy package and we also could try our best to package the product to meet your requirement.
Delivery Details: We have the most reliable transportation to make sure your goods arrived your destination as soon as possible.
Our Consumer
Every consumer has the chance to visit our workshop before placing the order. we will provide comfortable environment and completed product information for you to know our product deeply. Welcome your inquiry and sincerely hope we can cooperate with each other!
FAQ
A: We are factory.
A: Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.
A:We have exported our boilers and service to more than 50 countries./ we have specialize team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturing technology.