Factory Direct ISO Certificate Header for Boiler

Product Details
Customization: Available
Certification: ISO, TUV
Customized: Customized
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
800
Year of Establishment
2003-04-22
  • Factory Direct ISO Certificate Header for Boiler
  • Factory Direct ISO Certificate Header for Boiler
  • Factory Direct ISO Certificate Header for Boiler
  • Factory Direct ISO Certificate Header for Boiler
  • Factory Direct ISO Certificate Header for Boiler
  • Factory Direct ISO Certificate Header for Boiler
Find Similar Products

Basic Info.

Model NO.
Customized
Surface Treatment
Painted
Fuel
Coal
Range of Applications
Power station, Industrial
Type
Boiler Drum
Name
Boiler Drum
Size
Customized or Design Service
Color
as You Required
Delivery Time
Within 30 Days
Transport Package
Seaworthy Package
Specification
customized
Trademark
HTEG
Origin
China
HS Code
8402119000
Production Capacity
200ton/Month

Product Description

Factory Direct ISO Certificate Header for Boiler

The boiler headers have water wall header, superheater header,economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

The critical point to manufacture the end cover is the welding process. We adopt the advanced manufacture process, the complete large sized device and mature technology, especially the welding of the end cover with the header, we adopt the auto submerged welding, this welding method exists the high manufacture efficiency, good quality, the artistic welding appearance, safe and reliable operation.
Material

The header is consisted of header body ( large diameter seamless steel tube ), end cover ( enclosure ) , tube joint, hand hole, thermomter socket and so on. And the welding checking is strictly proceeded as the welding process to guarantee 100% qualified products.



Packaging and Delivery

Packing Details: Fixed with steel frame
Delivery Details: 30 days after deposit paid


Our Products:
utility boilers, biomass boilers, heat recovery boilers and boiler parts, such as enamel air preheaters, low temperature economizers, water wall, super heaters and headers, etc.




How's Quality Control 
1. Strength calculation report with applied materials information;

2. 100%NDT(non-destructive  inspection)  report  of steel  plate,  tube  and welding rod;

3. 100%X-ray inspection  report  (welding seam):  to  ensure the quality of the entire boiler;

4. Hydraulic test report: ensure the standard working pressure and safety

 

Factory Direct ISO Certificate Header for BoilerFactory Direct ISO Certificate Header for BoilerFactory Direct ISO Certificate Header for BoilerFactory Direct ISO Certificate Header for BoilerFactory Direct ISO Certificate Header for Boiler

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier