Power Plant Boiler Part Spiral Finned Tube Economizer

Product Details
Customization: Available
Certification: ISO, ASME
Customized: Customized
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
800
Year of Establishment
2003-04-22
Find Similar Products

Basic Info.

Model NO.
Customization
Surface Treatment
Painted
Fuel
Coal
Range of Applications
Power station, Industrial
Type
Boiler Part
Product Name
Power Plant Boiler Part Spiral Finned Tube Economi
Application
Industry Boiler, Power Plant Boiler
Color
as Your Requirement
Warranty
1 Year
Brand
Hteg
Condition
New
Transport Package
Standard Seaworthy Package
Specification
Customization
Trademark
HTEG
Origin
Shandong, China
HS Code
8402111000
Production Capacity
200 Ton/Month

Product Description

Power Plant Boiler Part Spiral Finned Tube Economizer

Product Description
Power plant boiler part spiral finned tube economizer is a heat exchanger device that captures the "lost or waste heat" from the boiler's hot stack gas. The boiler supplier spiral finned tubes economizer typically transfers this waste heat to the boiler's feed-water or return water circuit, but it can also be used to heat domestic water or other process fluids. Capturing this normally lost heat reduces the overall fuel requirements for the boiler. Less fuel equates to money saved as well as fewer emissions - since the boiler now operates at a higher efficiency. This is possible because the boiler feed-water or return water is pre-heated by the economizer therefore the boilers main heating circuit does not need to provide as much heat to produce a given output quantity of steam or hot water. Again fuel savings are the result. Power plant boiler part spiral finned tube economizers improve a boiler's efficiency by extracting heat from the flue gases discharged.

Material composition 
It is made of spiral finned tubes, inlet header, outlet header, elbow and other supporting material.
Structural arrangement 
Spiral finned tubes are in-line arrangement or staggered layout, water in the pipe.

Features
Due to the expanded heat transfer area, economizer tube row number decreases, thus reducing the possibility of the welding work and solder joint leakage, improve the safety and reliability of the pressure parts Heat transfer condition in the same conditions, its weight is lighter, about 70% of the light tube economizer, the materials about 45% of the light tube economizer;
1) Anti-corrosion
2) Anti-wear
3) Lower contact resistance
4) Higher Stability
5) Anti- dust

Company Profile
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
 
Our Clients
Every consumer has the chance to visit our workshop before placing the order. we will provide comfortable environment and completed product information for you to know our product deeply. Welcome your inquiry and sincerely hope we can cooperate with each other!

Our Certifications
1) Certificate of conformity of quality management system certification
2) Environmental management system certificate
3) Occupational health and safety management system certificate
4) Installation, Alteration, Repair & Maintenance License of Special Equipment People's Republic of China

Warranty

1.One year warranty

2.Spare parts available at ex-factory price

3.Different voltage available

4.100% tested before delivery

5. Assist clients to prepare for the first construction, and also can arrange engineer

onsite instruction of installation and commissioning

6. Train the first-line operators;

7. Examine the equipment;

 
FAQ
Q1: Are you trading company or manufacturer ?
A: We are factory.
Q2:When the product can be delivered?
A: Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.
Q3:What's the advantage of your company?
A:We have exported our boilers and service to more than 50 countries./ we have specialize team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturing technology.

Contact Us
sunny jia
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier