Working high efficiency boiler spare part header for economizer
Specification:
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.
Introduction:
In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.Boiler part headers for steam boiler have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
2016 hot sell boiler medium header for steam boiler is acting as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
Our company:
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
Other products:
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer.
Our workshop&shipment:
The product line control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
FAQ
Q1: Which port is closest to your location?
A: Qingdao Port is closest to our factory, about 1 hour driving distance to our place.
Q2: How about your delivery time?
A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.
Q3: Do you offer overseas installation service?