Product Description
China manufacture industry boiler enamel basket with high standard technology
Introduction:
China manufacture industry boiler enamel basket with high standard technology are a compact arrangement of profiled metal sheets placed in the Air Preheater rotor in two or more layers and plays the most important role in the process of heat recovery. The bottom layer, or the cold end layer, is where the air enters and the flue gases are discharged, and is therefore, subjected to severe corrosion due to acid dew point. The Material of Construction and the Profile design of the Heating Elements depends on the operating conditions, quality and type of fuel, etc.
To solve the problem of corrosion to air preheater at low temperature environment and ash fouling, our company has developed a new kind enamel glaze with anti-abrasion, anti-corrosion, and less fouling features.
Advantages:
Introducing Germany equipment and adopting advanced technology
Using imported enamel glaze material
Adopting technology of electrostatic coating
Products with national patents
Abrasion resisting , less wear and tear and smooth surface with less fouling
.
Other products:
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer.
Our company:
Shandong Hengtao Group, founded in 1995, is located in Gaomi City, Shandong Province. Hengtao Group has 470,000,000 RMB of total registered capital, 1,400,000 square meter of land coverage, about 2000 employees and over 3 billion RMB of total assets.
We are one of the manufacturers of boiler and boiler parts in China. We have a team of engineers who have more than 20 years' experience in designing, manufacturing, engineering, supplying of boiler and its spare parts. We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, H-finned tube economizer, spiral finned tube economizer, membrane water wall, header and other customized boiler parts.
Our workshop&shipment:
The product line control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
FAQ
Q1: Which port is closest to your location?
A: Qingdao Port is closest to our factory, about 1 hour driving distance to our place.
Q2: How about your delivery time?
A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.
Q3: Do you offer overseas installation service?
Contact me:
NAME: Tiago zhang
TEL: 0086-18363621969