Using High Frequency Welder Carbon Steel Spiral Tube Economizer

Product Details
Customization: Available
Certification: ISO, TUV, ASME,SGS
Customized: Customized
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
800
Year of Establishment
2003-04-22
Find Similar Products

Basic Info.

Model NO.
customized
Surface Treatment
Painted
Fuel
Coal
Range of Applications
Power station, Industrial
Type
Boiler Part
Name
Using High Frequency Welder Carbon Steel or Staile
Color
Customized
Size
Customized
Warranty
1 Year
Available
Energy Saving
Application
Boiler System
Material
Carbon Steel or Stailess Steel
Transport Package
Seaworthy Package
Specification
customized
Trademark
HTEG
Origin
China
HS Code
8402119000
Production Capacity
200ton/Month

Product Description

Using High Frequency Welder Carbon Steel Spiral Tube economizerSpecification:

Using high frequency welder carbon steel or stailess steel spiral tube is the most widely used of the spiral finned tube, widely used in electric power, metallurgy, cement industry preheating collection and petrochemical industries. Carbon steel or stailess steel spiral tube is welded steel strip coil pipe at the same time, using high-frequency currents of the skin effect and proximity effect of steel tube, and surface heat until melted in the plastic state or steel strip coil, the complete welding under certain pressure. This kind of high frequency welding as a solidphase welding. It with Mosaic, brazing (or whole galvanized) method, whether in product quality (fin of weld rate is high, of 95%), or the productivity and automation degree, are more advanced.

Application
In boilers, economizers are heat exchange devices that heat fluids, usually water, up to but not normally beyond the boiling point of that fluid. Economizers are so named because they can make use of the enthalpy in fluid streams that are hot, but not hot enough to be used in a boiler, thereby recovering more useful enthalpy and improving the boiler's efficiency. They are a device fitted to a boiler which saves energy by using the exhaust gases from the boiler to preheat the cold water used to fill it (the feed water).

Parameter

Name

Using high frequency welder carbon steel or stailess steel spiral tube

Standard

ASME SA213/ASTM A213,ASME SA106/ASTM A106,ASME SA179/ASTM A179,ASTM B111

Base Tube Material

stainless steel, carbon steel, copper alloy,alloy steel (No theoretical limit)

Fin Material

Aluminium,Copper Alloy,Stainless Steel,Carbon Steel

Fin tube Max design temperature

<450°C

Base pipe O.D

25-165mm

Fins per inch

20 Nos(as customer's request)

Fin depth

0.5-3mm

No fin area on both side

As Customer's request.

Design Temperature

Below 450°C

Product processing 

Extruded,Embedded,High Frequency Welding etc.

Ends

PE/Plain Ends, BE/Beveled Ends

Test Requirement

Physical Property Test,Chemical Composition Analysis,Non-Destructive Test,Other Inspection and
Test as customer's requirement.

Application

Air Cooler,Charge Air Chiller, Condenser,Evaporator, Fluid Cooler, Gas Cooler,Oil Cooler, Radiator, Refrigeration,Steam to Air Heat Exchanger,superheater etc.

Features
1) Anti-corrosion
2) Anti-wear
3) L ower contact resistance
4) Higher Stability
5) Anti- dust

Related Products

Our Company & Workshop & Packing & Shipment & Certificates

Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries. 
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
Grade A boiler manufacturing; installation and contract of electromechanical equipment; EPC qualification for electric power engineering construction; installation, transformation and maintenance qualification of Grade 1 boiler and A2 pressure vessel manufacturing. We also have ISO, TUV, ASME, SGS ect. certifications.

 Clients

Hengtao products have been exported to Mongolia, Turkey, Thailand, Vietnam, Indonesia, India, Iran and other oversea countries and areas.

FAQ

Q:Who are you? Trade Company or manufacturer?
A: We are manufacturer and we have our own trade company.

Q: What's your Payment Terms ?
A: L/C( high bank charge, not suggest , but acceptable )
    T/T( 70% deposit , 30% before shippment) 
    100% Western Union in advance. (specially forairshipment or small amount)

Q: What's the Min order to your company?

A: 1 set. The sample order, if we have stocks, we will send out the products within 1 week.

Q:What is the MOQ?
A: Our MOQ is 10 tons,but if you have other requirements, please contact us.4

Q:Where is your factory located? How can I visit there? 
A: our factory is located on Factory of the Industrial Park, Gaomi, Weifang City, Shandong Province. All our clients, from home or abroad, are warmly welcome to visit us!
Contact

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier