China manufacture good quality manifold header for double drums boiler
Specification:
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc. In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.Boiler part headers for steam boiler have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
2016 hot sell boiler medium header for steam boiler is acting as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
Application:
The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
Other products: Enamel coated sheet
Features:
To solve the problem of corrosion to air preheater at low temperature environment and ash fouling, our company has developed a new kind enamel glaze with anti-abrasion, anti-corrosion, and less fouling features.
1. Introducing Germany equipment and adopting advanced technology
2. Using imported enamel glaze material
3. Adopting technology of electrostatic coating
4. Products with national patents
Abrasion resisting , less wear and tear and smooth surface with less foulin
Our company:
Shandong hengtao group, founded in 1995, is located in gaomi city, shandong province.Hengtao group has 470,000,000 RMB of total registered capital, 1,400,000 square meter of land coverage, about 2000 employees and over 3 billion RMB of total assets.
We are one of the manufacturers of boiler and boiler parts in China.We have a team of engineers who have more than 20 years' experience in designing, manufacturing, engineering, supplying of boiler and its spare parts.We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, h-finned tube economizer, spiral finned tube economizer, membrane water wall, header and other customized boiler parts.
Our workshop&shipment:
The product line control:
1.Strength calculation report with applied materials information;
2.100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3.100%X-ray inspection report (welding seam):To ensure the quality of the entire boiler;
4.Hydraulic test report:Ensure the standard working pressure and safety
Faq
Q1:Which port is closest to your location?
A:Qingdao port is closest to our factory, about 1 hour driving distance to our place.
Q2:How about your delivery time?
A:Generally, it will take 30-45 day after receiving your advance payemnt.The specific delivery time depends on the items and the quantity of your order.
Q3:Do you offer overseas installation service?
Contact me:
Name:Tiago zhang
Tel:0086-18363621969