China High Efficiency Boiler Part Header with Carbon Steel

Product Details
Customization: Available
Certification: ISO, ASME
Customized: Customized
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
800
Year of Establishment
2003-04-22
Find Similar Products

Basic Info.

Model NO.
Customization
Fuel
Coal
Range of Applications
Power station, Industrial
Type
Boiler Parts
Product Name
China High Efficiency Boiler Part Header
Application
Industry Boiler Power Plant Boiler
Color
as Your Requirement
Warranty
1 Year
Characteristic
Energy Saving
Brand
Hteg
Transport Package
Standard Seaworthy Package
Specification
Customization
Trademark
HTEG
Origin
Shandong, China
HS Code
8402111000
Production Capacity
150 Ton/ Year

Product Description

China High Efficiency Boiler Part Header with Carbon Steel
Producrt Description
High efficiency boiler part headers with carbon steel have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production. When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.

Specifications
High efficiency boiler part header with carbon steel is consisted of header body ( large diameter seamless steel tube), end cover (enclosure), tube joint, hand hole, thermometer socket and so on. And the welding checking is strictly proceeded in the welding process to guarantee 100% qualified products.
Function
High efficiency boiler part header with carbon steel is connected with the boiler outlet pipe to distribute steam to different places. Usually, there are several check valve about the cylinder to control the steam flow direction. The small pipe under the cylinder is to drain out cooling water from cylinder. High efficiency boiler part header with carbon steel is mainly used for power generation, Iron and steel industry, oil and chemical industry, cement industry, and construction industry, etc.

Our Company
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd. established in 2003, which is specialized in designing, manufacturing, engineering, supplying of boilers, boiler components and boiler auxiliaries.

Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer. We are also the provider for boiler integrated energy-saving solutions and we have EPC qualification.
Package & Delivery
Packing Details: We have standard seaworthy package and we also could try our best to package the product to meet your requirement.

Delivery Details: We have the most reliable transportation to make sure your goods arrived your destination as soon as possible.

Consumer Visit
Every consumer has the chance to visit our workshop before placing the order. we will provide comfortable environment and completed product information for you to know our product deeply. Welcome your inquiry and sincerely hope we can cooperate with each other!

Certifications

1) Certificate of conformity of quality management system certification

2) Environmental management system certificate

3) Occupational health and safety management system certificate

4) Installation, Alteration, Repair & Maintenance License of Special Equipment People's Republic of China
5) ASME Standard qualification
FAQ
Q1: Are you trading company or manufacturer ?

A: We are factory.

Q2:When the product can be delivered?

 A: Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.

Q3:What's the advantage of your company?

A:We have exported our boilers and service to more than 50 countries./ we have specialize team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturing technology.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier